Timesheet Corrections: Which Changes Are Legitimate and Which Are Red Flags
Fixing a timesheet is normal, and DCAA says how to do it. A correction becomes a problem when the record cannot show what changed, who changed it and why, or when the reason is the budget.
Timesheet corrections are legitimate when the record keeps the original charge, shows the corrected one, and carries the employee’s agreement to the change. They become red flags when someone else makes them, when they follow a budget rather than the work, or when they arrive in batches. The change itself is rarely the issue. The missing record is.
This guide covers what DCAA expects a correction to show, who may make one, the patterns its auditors are told to look for, and what to do when a manager asks for hours to be moved. It is read from DCAA’s manual for contractors, DCAAM 7641.90, and from the audit program its auditors follow for labor.
The question usually comes from an employee, and it usually sounds like this. A manager says two months of hours on a contract need to move to overhead. The contract is over budget, and the hours “were really admin anyway.” The hours have already been billed.
Nobody in that conversation thinks of it as fraud. It is also exactly the situation DCAA’s guidance is written about, and the answer depends on three things the manager did not mention.
The short version
- Corrections are expected. DCAA’s manual describes how changes should be documented. It does not ask for timesheets that never change.
- Three things make one legitimate. The original charge, the corrected charge, and the employee’s concurrence, all on record.
- The work decides the charge. Available funding and contract type are named as things that must not.
- Supervisors do not complete timesheets. The one exception is prolonged authorized leave, and the employee replaces it on return.
- Auditors look for patterns. Consistent time splitting, changed charging patterns, corrections and alterations, and entries made by someone else.
- An overwrite destroys the evidence. A correction that keeps its history is stronger than a record that seems never to have needed one.
Can you correct a timesheet after it has been submitted?
Yes. People charge the wrong task, forget an afternoon of leave, or pick last month’s project number. DCAA’s manual for contractors treats correcting a timesheet as a routine event and sets out what the procedure should capture.
What DCAA expects of a change
“Changes to the timesheet should be documented and supported through procedures that identify the original time charge, the corrected time charge, and documentation from the employee indicating his/her concurrence with the change.”
Source: DCAAM 7641.90, Enclosure 3
That is three elements: what the entry said first, what it says now, and proof that the employee whose time it is agreed to the change.
DCAA’s audit program adds the supervisor. When auditors document a contractor’s timekeeping procedures, they check whether all changes are initialed or approved by both the employee and the designated approving supervisor. So a correction passes through two people, and the record shows both.
Nothing in that list forbids a change. The expectation is that a change leaves a trail. A system that makes corrections easy and visible meets it. A system that makes them invisible does not, however accurate the final numbers are.
A correction, kept whole
A correction in TimeRewards is never an overwrite. The Complete Audit Trail, on every plan, keeps the previous value beside the new one, with the person who made the change, the timestamp and the reason they gave. The employee sees it and confirms it. One-click DCAA compliance is on every plan. Plans start from $9.99 per user per month, minimums apply.
What does a legitimate correction look like?
It fixes the record to match the work, soon after the mistake, with the employee’s hand on it. Most timesheet corrections in a healthy system are small, quick and boring.
| What happened | Why it holds up |
|---|---|
| An engineer picks the wrong task on Tuesday and fixes it Wednesday morning, with a note | The employee made the change, close to the event, and the note explains it |
| Four hours of leave were entered as work, and the employee corrects it before the period closes | Original and corrected values are both on record, and the supervisor approves again |
| A proposal effort was charged to a contract by mistake, and the employee moves it to bid and proposal | The nature of the work decides the charge, and the employee concurs |
| A supervisor returns a timesheet with a question, and the employee revises it | The supervisor asked. The employee changed it |
The fourth row carries the most weight. A reviewer who spots a problem sends the timesheet back. The person who did the work decides what the entry should say, and the reviewer approves the result.
Timing helps too. DCAA expects employees to record their time daily, and a correction made the next morning rests on the same fresh memory as the entry. One made eight weeks later rests on a reconstruction, and the record should say what it was reconstructed from.
Which timesheet changes are red flags?
The ones that form a pattern, and the ones the employee did not make. DCAA’s audit program tells auditors what to look for when they inspect time records, starting with the most recent period.
What auditors look for in time records
“patterns of consistent time splitting, changes in charging patterns, corrections, alterations, or indications that someone other than the employee is completing the timecard or electronically inputting the employee’s time.”
Source: DCAA audit program 10310, pre-interview analysis
Corrections are on that list as something to examine, alongside four other signs. In practice the warning signs look like this.
| Red flag | What it suggests |
|---|---|
| Hours move when a budget runs out | Funding, rather than the work, is deciding the charge |
| The same change across several people at once | A decision made above the employees and applied to their records |
| A supervisor or admin makes the edit | Someone other than the employee is entering the time |
| Changes cluster at period end | The record is being tidied to fit a number |
| No reason, or the same reason every time | The explanation was added for form’s sake |
| Changes after approval, with no second approval | The approved record and the paid record are different records |
| Time split identically every week | A formula is being recorded in place of the work |
None of those proves labor mischarging. Each is a reason for an auditor to look closer, and the audit program says where that leads. Employees whose records show a high probability of mischarging are selected for detailed interviews, with questions written for each of them in advance.
Auditors also cross-check. The same program has them compare travel expense reports with labor charges, so a week charged to one contract by someone traveling for another stands out without any correction at all.
Who is allowed to change an employee’s timesheet?
The employee. DCAA’s manual is direct about supervisors: a supervisor should be prohibited from completing an employee’s timesheet, unless the employee is absent for a prolonged period on authorized leave. Even then, the employee submits a timesheet on return to replace the one the supervisor prepared.
The reason is in the manual’s section on internal control. Responsibilities for labor should be separated, and supervisors who are accountable for meeting contract budgets should not have the opportunity to initiate employee time charges. The person with a budget to protect is the last person who should be typing hours.
DCAA’s audit program tests the same separation from the other side. Auditors ask whether the people who prepare or approve time records are separate from the people responsible for operating within budgets. Where they are not, the auditor weighs how much payroll that one person can influence.
A very small company cannot always separate those roles, and the manual recognizes that. What a small company can always do is make sure every change shows who made it. That turns a weak separation into a visible one.
- Employees enter and correct their own time.
- Supervisors review, question, return and approve. They do not edit.
- Administrators may need to act for an employee on prolonged leave, and the record should show it was them.
- Finance works from approved hours and sends questions back through the same route.
What if a manager asks you to move hours to overhead?
Ask what the work was. That single question settles most of it, and DCAA’s manual says why.
What decides the charge
“The instructions should state that the nature of the work determines the proper distribution of time, not availability of funding, type of contract, or other factors.”
Source: DCAAM 7641.90, Enclosure 3
Go back to the manager and the two months of hours. Three things decide whether the move is a correction or a problem.
Was the work actually overhead?
If people were doing contract work, the hours belong on the contract, whatever the budget says. If some of it really was internal work charged in error, those hours can move, and only those.
Does each employee agree?
The concurrence DCAA asks for belongs to the person whose time it is. A change made for six people needs six agreements, each from someone who remembers the work.
Does the record show the whole story?
The original charge, the new charge, who changed it, when, and the reason. “Contract over budget” is a reason that describes funding. “Hours were proposal support, charged in error” describes work.
If the answer to the first question is no, the conversation is over, and the over-budget contract is a different problem with different remedies. An overrun is something to raise with the contracting officer. It is never something to solve on a timesheet.
If the hours were already billed, a legitimate correction does not stop at the timesheet. The cost on the contract changes, so the next voucher has to carry the adjustment, and the overhead pool grows by the same hours. Finance needs to know the day the change is made.
An employee who is uneasy about a request has a simple, safe response. Ask for it in writing, describe the work as it was, and let the record carry both. DCAA’s manual says the accurate preparation of a timesheet is the employee’s own responsibility, so the employee is entitled to be careful about it.
Roles that match the rule
TimeRewards separates who records time from who approves it. Granular manager, admin and user roles on every plan decide who can touch an entry, and Project & Task Restrictions keep each employee to the charge numbers they are assigned. Custom Approval Workflow routes every timesheet to its approver, and Multi-Level Timesheet Approval Workflow on Professional adds a second approver where budgets and approvals need separating.
What should the record show for every change?
Enough for a stranger to follow it a year later. That is the practical test, because the person reading it will be an auditor who was not there.
| The record keeps | The question it answers |
|---|---|
| The original entry | What did the timesheet say before? |
| The corrected entry | What does it say now? |
| Who made the change | Was it the employee? |
| When it was made | How long after the work, and before or after approval? |
| The reason | Does it describe the work, or the budget? |
| The employee’s concurrence | Did the person whose time it is agree? |
| The approval that followed | Did a supervisor see the corrected version? |

Paper systems met this with a single line through the old figure, the new figure beside it, and two sets of initials. The principle has not changed. An electronic audit trail does the same job, provided the old figure is still there to read.
That is the weakness of a spreadsheet. A cell holds one value. When somebody types over it, the previous value is gone, along with who changed it and why. The numbers can be perfectly right and the record still cannot show how it got there.
How late can a correction be made?
Neither DCAA’s manual nor its audit program sets a deadline. What changes with time is how much the correction has to carry, so the practice below is ours rather than a rule.
- Before approval. The employee corrects and resubmits. This is where most changes belong.
- After approval, before payroll and billing. The timesheet goes back, the employee corrects it, and the supervisor approves again.
- After the period is paid and billed. The period is reopened deliberately, by someone with the authority to do it, and finance carries the change into payroll, the voucher and the indirect pools.
- Months later. The correction needs a reason that explains the delay, and something to support the employee’s memory: calendar entries, deliverables, travel records.
Closing a period is what makes those stages real. Once approved hours are locked, a late change cannot happen quietly. Somebody has to reopen the period, and that act goes on record too.
What happens when an auditor finds a pattern?
The audit widens. A handful of documented corrections ends the inquiry. A pattern starts one.
The audit program sets the path. The auditor analyzes the labor records for the risk area and selects employees for detailed interviews. Each is asked about their projects, the work they performed, the charge numbers they used and how they keep their time, including any informal records.
From there, questioned labor costs are carried into the incurred cost audit for that year. Under the FAR’s cost principles, a contracting officer may disallow a claimed cost that is inadequately supported. A weakness in the controls themselves can be reported as a deficiency in the accounting system. Our guide to what happens in a DCAA floor check follows that path step by step.
DCAA’s manual adds the personal side. It expects company policy to say that careless or improper timesheet preparation may lead to disciplinary action under company policies, as well as under applicable federal statutes. That sentence is written for employees and managers alike.
Late changes, made visible
Lock Timesheets, on every plan, closes an approved period so the hours that were paid and billed stay the hours on record. Reopening one is a deliberate step, never a quiet edit. Timesheet Notes carry the reason beside the entry, and 100+ pre-built reports show hours by person, project and period, so a month of changes can be reviewed before an auditor asks.
What should you check this month?
Pull every timesheet change from the last full month. If your system cannot produce that list, you have found the first problem.
Then read the list the way an auditor would. Who made each change, the employee or someone else? How many came in the last two days of the period? Do the reasons describe work, or budgets? Did any contract lose hours in the same month it ran short of funding?
Last, test one correction end to end. Pick a change, and check that you can read the original value, the new value, the reason, the employee’s agreement and the approval that followed.
Free · nothing to fill in
Seven checks on a month of timesheet corrections
One month of changes, about half an hour. Each check matches something DCAA’s guidance asks for.
0 of 7 confirmed
For the arithmetic behind a correction, the time card calculator totals a week of clock readings and the decimal hours converter turns minutes into the decimals a timesheet uses. The wider set of expectations is in our guide to DCAA timekeeping requirements, the approval side is in timesheet approval workflows, and the overwritten correction is one of our common DCAA compliance mistakes. A year of hours becomes the labor schedules of the incurred cost submission. Our DCAA compliance page and our page for government contractors cover what TimeRewards does for the rest of it.
Questions people actually ask
Changing a timesheet to make it accurate is expected, and DCAA’s manual for contractors describes how to document it. The trouble starts when a change makes the record less accurate, such as moving hours to match a budget. DCAA’s manual notes that improper timesheet preparation may lead to disciplinary action and to consequences under applicable federal statutes.
A supervisor reviews, questions and approves. DCAA’s manual says a supervisor should be prohibited from completing an employee’s timesheet unless the employee is absent for a prolonged period on authorized leave, and that the employee should submit a replacement on return. When a supervisor spots an error, the timesheet goes back to the employee to correct.
DCAAM 7641.90 says changes should be documented through procedures that identify the original time charge, the corrected time charge, and documentation of the employee’s concurrence. DCAA’s audit program checks that changes are initialed or approved by both the employee and the approving supervisor.
Only if overhead is where the work belonged. DCAA’s manual says the nature of the work determines how time is distributed, and names the availability of funding as something that must not. Hours that were contract work stay on the contract. Hours charged there in error can move, with each employee’s agreement and the reason on record.
DCAA’s manual sets no deadline. It expects time to be recorded daily, so the sooner a correction follows the work, the better it stands. A change made after a period has been paid and billed should reopen that period deliberately and be carried through to payroll, the next voucher and the indirect pools.
Labor mischarging is charging time to a contract, project or account other than the one the work was done for. It can run in any direction: between contracts, from a contract to overhead, or from overhead to a contract. DCAA’s audit program selects employees for detailed interviews where their time records show a high probability of it.
A spreadsheet cell holds one value, so typing a correction over it removes the original along with who changed it and why. DCAA expects a change to identify the original charge and the corrected one. TimeRewards keeps both on every plan, with the person, the time and the reason, so the audit trail is a by-product of the correction itself.
Sources
- DCAAM 7641.90, Information for Contractors, Enclosure 3, 14 November 2023dcaa.mil, read 26 September 2026
- Audit program 10310, Non-Major Contractors Labor Floorchecks or Interviews, version 7.1, June 2025dcaa.mil, Directory of Audit Programs, read 26 September 2026
- FAR 31.201-2, Determining allowabilityacquisition.gov, checked 10 October 2026
Corrections that keep their history
The original value beside the new one, who changed it, when and why, with the employee’s confirmation and the approval that followed. The complete audit trail and one-click DCAA compliance come on every plan. Plans start from $9.99 per user per month, minimums apply, and the fourteen-day trial does not ask for a card.