Sage Intacct Nonprofit Timesheets: The Record Behind Every Salary Split
Sage Intacct records where each salary dollar landed. The timesheet records whose hours they were and what they were spent on, and a nonprofit charging federal awards needs both, connected.
Sage Intacct records where a salary landed: the program, grant, department and location each dollar was charged to. A timesheet records whose hours those were and what they were spent on. A nonprofit charging federal awards needs both, because 2 CFR 200.430(g) makes a salary charge only as good as the record of the work behind it.
This guide covers the handoff between the two for a nonprofit running Sage Intacct nonprofit timesheets through TimeRewards. It shows which dimensions a time entry should carry, how approved time moves into the ledger, how split-funded staff should record their time, and what an auditor traces back. The rules come from the Uniform Guidance at 2 CFR 200, and the dimension detail from Sage’s own documentation.
Picture month-end at a nonprofit with four federal awards and a dozen foundation grants. Payroll has posted, and a journal entry spreads a case manager’s salary across two of them: 60 percent to a federal award and 40 percent to a foundation grant. Every line carries the right dimensions, and the budget-to-actual report for the federal award looks healthy.
Then the single audit arrives, and the auditor samples that case manager. Where her salary went takes seconds to show, because the ledger answers it directly. The harder question is how anyone knew she spent 60 percent of that month on the federal award.
That answer lives in the time record. Getting it right is mostly a matter of connecting the two systems so the record and the entry always agree.
The short version
- Sage Intacct holds the money. Its dimensions tag each transaction with the program, grant, department and location it belongs to.
- The timesheet holds the evidence. It shows who worked the hours, on what, when, and who approved them.
- The Uniform Guidance asks for records of the work. Salary charged to a federal award must rest on records of the work actually performed.
- A budgeted percentage is a plan, not support. It can carry interim charges, and then has to be reviewed and adjusted to what actually happened.
- The handoff runs one way per record. Accounting structure flows from Sage Intacct into time entry, and approved hours flow back with their dimensions attached.
- Name your dimensions with care. Sage warns that a user-defined dimension named with the word restriction can cause integration issues.
What does Sage Intacct record about staff time?
The cost, and where it belongs. Sage’s documentation describes a dimension as a tag with a set of values related to transactions and entries. It puts the point in one sentence.
How Sage Intacct describes a dimension
“Every transaction can be tagged with multiple dimension values to help you identify the transaction and report on it.”
Source: Sage Intacct help, Dimensions overview
For a nonprofit, that is the practical heart of fund accounting. Donors and grantors restrict money to a purpose, and the organization has to show it was spent there. Dimensions let one chart of accounts report by program, grant or funder, without a separate set of books for each.
Salaries reach the ledger through payroll. The split across awards arrives as an allocation or a journal entry. Each line carries its dimension values from that point. From then on, any report in Sage Intacct can show how much of a person’s pay went to a given grant, in a given month, at a given site.
What the entry holds about the reason for the split is whatever was typed into it. That is the ledger doing its job, which is recording transactions. The reason itself, the record of the work, is created somewhere else: on a timesheet, at the time the work happens.
| What an auditor asks | Where the answer lives |
|---|---|
| How much salary was charged to the award? | Sage Intacct, reported by the grant’s dimension value |
| Which program, department and site does it belong to? | Sage Intacct dimensions on each line |
| Who worked those hours, and when? | The approved timesheet |
| What was the work? | The time entries, their projects and tasks, and their notes |
| Who approved the time, and did anyone change it? | The approval record and the audit trail |
| Does the split match the work? | The timesheet, compared with the allocation |
Four of those six answers come from the time record. That is why the connection between the two systems matters more than either system alone.
Both halves, connected
TimeRewards keeps the time record and hands it to Sage Intacct already coded. Projects, tasks, items, employees and the dimensions you use sync in from Sage Intacct, so staff record time against your real accounting structure. Approved time goes back with the same references attached. The Sage Intacct integration is on the Professional and Enterprise plans.
Why does a salary split need a time record behind it?
Because the Uniform Guidance asks for one behind every dollar of salary charged to a federal award. The documentation standard sits at 2 CFR 200.430(g), under the heading Standards for Documentation of Personnel Expenses, and its first sentence settles the question.
The documentation standard
“Charges to Federal awards for salaries and wages must be based on records that accurately reflect the work performed.”
Source: 2 CFR 200.430(g)(1)
The paragraph then lists what those records must do. They need a system of internal control behind them that gives reasonable assurance the charges are accurate, allowable and properly allocated. They must be part of the organization’s official records. And they must reflect the employee’s total compensated activity, never more than 100 percent of it.
They must also cover federal and all other activities on an integrated basis, and follow the organization’s own written accounting policies. A separate timesheet kept only for the federal award, with the rest of the week left blank, falls short on both counts.
The sixth requirement is the one a salary split rests on. Records must support the distribution of pay among cost objectives when an employee works on more than one federal award, or on a federal award and a non-federal one. The same applies across direct and indirect work, and between an allowable activity and an unallowable one.
Read against the case manager, that is her whole situation. She works on a federal award and a foundation grant, so her records have to support the 60 and 40 that payroll posted.
Three more parts of the same paragraph decide what a nonprofit records from day to day.
- Budget estimates alone are not support. A percentage set before the work happens can carry interim charges. Significant changes have to be recorded promptly, and the charges later reviewed and adjusted to actual.
- Nonexempt staff need hours every day. Their pay must also be supported by records of the total hours worked each day, following the Fair Labor Standards Act recordkeeping rules at 29 CFR part 516.
- Match gets the same treatment. Salaries counted toward cost sharing on a federal award are supported exactly like salaries claimed for reimbursement.
The standard describes what records must do rather than what they must look like. That leaves room to record in whatever shape fits the organization, provided the record does those things. Meet it, and (g)(2) says no additional support can be asked for beyond the daily hours for nonexempt staff.
Fall short, and (g)(8) lets the federal government require personnel activity reports, including prescribed certifications. A nonprofit that meets the standard keeps its own records. One that does not ends up filling in somebody else’s. Our page on grant compliance time tracking shows how TimeRewards is built around that standard.
Which dimensions should Sage Intacct nonprofit timesheets carry?
The ones your grant and program reports are built on, and no more. A time entry only has to carry what the ledger needs to post the hours to the right place and report on them.
Sage Intacct ships with standard dimensions, and an organization adds its own where those run out. The standard set includes location, department, project, customer, vendor, employee, item and class, with task alongside project in the Projects applications. User-defined dimensions are used exactly like the standard ones, wherever dimensions appear.
That gives a nonprofit a lot of room to model its world. A grant can be a project. A program can be a department or a dimension of its own, and a funder or restriction class can sit on class or a user-defined dimension. Which choice is right depends on how reports are built today, and the time entry should follow that choice rather than invent a parallel one.
| On one time entry | What it can hold |
|---|---|
| Project | The award, program activity or client engagement the hours belong to |
| Task | The specific activity within that project |
| Item | The labor or service item used for costing and billing |
| Department | The employee’s department or program area |
| Location | The site or region where the work happened |
| Class, or your own dimension | A grant, program or funder classification |
| Employee | Who worked the hours, from the synced employee assignment |
Every value on that list comes from Sage Intacct rather than being typed. That is the point of syncing the structure in: an employee cannot invent a grant code, misspell a program or charge a project that finance has never set up.
Two pieces of Sage’s own setup guidance matter here. The first is to design dimensions around reporting, security and workflow together. Sage’s setup considerations list timesheets, and project and grant costs, among the areas where approvals are decided. A dimension no approver ever sees on a timesheet is a dimension nobody checks.
The second is about names, and it catches nonprofits in particular.
Sage’s warning on dimension names
“When working with customizations, avoid user-defined dimensions containing the following words in their names: restriction, event, events, and log. Using these key words can result in integration issues.”
Source: Sage Intacct help, Dimensions overview
Restriction is the natural word for a nonprofit to reach for. A dimension tracking donor restrictions, or a program called Events, needs a different name before any integration touches it. Net asset class, purpose or fund type all carry the same meaning without the risk.
Sage also lets one dimension preset another through dimension relationships, so a customer’s usual location fills itself in on a transaction. The idea behind that feature applies to time entry as well: the fewer choices an employee makes, the fewer they can get wrong. TimeRewards shows each employee only the projects and activities assigned to them, so the list they choose from is short and correct.
How does approved time move from TimeRewards into Sage Intacct?
One direction per record. Accounting structure comes into TimeRewards from Sage Intacct, and approved hours go back to Sage Intacct carrying that structure. Sage Intacct stays the financial system of record throughout, as the Sage Intacct integration page sets out in full.
The structure syncs in
Projects, tasks, items, employees and the dimensions you use are synchronized from Sage Intacct. Nobody retypes a code, and the values in time entry are the values in the ledger.
Employees record time against it
Each entry takes the project and accounting selections that apply to that employee’s work. Project and task restrictions keep the choices to what the employee is actually assigned.
Managers review and approve
Timesheets route through your approval workflow. An incomplete or miscoded timesheet goes back to the employee for correction before it reaches the ledger.
Approved time is validated
Only approved time is prepared for synchronization, and it is checked on the way.
It posts with its references
Timesheet data is sent to Sage Intacct with the accounting references it was recorded against, so the hours land on the right project, department, location and grant.
The order matters more than any single step. An error is cheapest to fix where it starts. This sequence puts approval, correction and validation ahead of the ledger rather than after it.
The alternative most finance teams know is the spreadsheet import. Someone exports hours, reformats columns, translates project codes and re-imports the file. Each of those steps is a place for a duplicate entry, a missing task, a wrong employee mapping or an outdated code to slip into the books.
Those errors do more than cost time at month-end. A salary line posted to the wrong grant is an unallowable charge on one award and a missing one on another. The time record then no longer matches the ledger it was meant to support.
Should split-funded staff record percentages or hours?
Either can work, provided the numbers describe the work that happened rather than the plan made in advance. That line runs between two neighboring clauses of 200.430(g).
(g)(1)(vii) says budget estimates, meaning estimates determined before the services are performed, do not qualify as support on their own. (g)(1)(viii) says records may reflect categories of activities expressed as a percentage distribution of total activities. The same number can fall on either side of that line.
A 60 percent written into a grant budget in June is a plan. A 60 percent the case manager records as the share of her October actually spent on the federal award is a record. Payroll can post either one, but only the second supports the charge.
Interim use of an estimate is allowed, on three conditions. The system has to produce reasonable approximations of the work performed. Significant changes in the work have to be identified and recorded promptly. And the organization’s internal controls have to include periodic after-the-fact reviews, with adjustments so the final charge to the award is accurate.
A nonprofit that books payroll at budgeted percentages all year and never looks back has skipped the review. That review is what turns a plan into a charge that holds up.
Which method fits depends on the employee. Exempt staff who split their time across programs often think about their week in shares, and percentage entry records it that way. Nonexempt staff need a record of total hours worked each day under (g)(3). Their daily hours come first, and the split follows from them. Daily timesheets on every plan, with an automated email when one is missing, keep that record current before the period closes.
A plan, then a record
Percentage-Based Time Entry turns a budgeted split into a confirmed one. An administrator sets a default allocation as guidance, based on the role or the grant. Each week the employee confirms it or adjusts the percentages to how the time was actually spent. TimeRewards then distributes the hours across the days, allowing for schedules, holidays and time off. It is on the Professional and Enterprise plans, and the percentage entry guide shows it step by step.
Who should approve time before it reaches the ledger?
Someone who knows whether the work happened. On grant-funded time, often a second person who knows whether the award can carry it.
A supervisor can confirm the hours were worked. A program manager or grant administrator can confirm the charge belongs on that award. Finance can confirm the coding before anything posts. The integration lets timesheets route through any of those reviewers on the way to Sage Intacct, in whatever order your policy sets.
The Uniform Guidance frames all of this as internal control. Records need a system behind them that gives reasonable assurance the charges are accurate, allowable and properly allocated. Approval is the visible part of that system. The rest is what happens to a record after someone approves it.
- Custom Approval Workflow, on every plan, routes each timesheet to the right approver for the project or program it carries.
- Multi-Level Timesheet Approval Workflow, on Professional and Enterprise, adds a second approver, so a grant administrator can sign after the supervisor.
- Lock Timesheets, on every plan, closes an approved period so the hours that posted to Sage Intacct stay the hours on record.
- Complete Audit Trail, on every plan, keeps the original value of every corrected entry, along with who changed it and when.
That last one answers the question auditors ask right after “who approved this?” A correction is normal, and a record that shows its corrections is stronger than one that appears never to have needed any.
What does an auditor trace, from the grant back to the employee?
A chain with six links. The first three sit in Sage Intacct, and the last three sit in the time record.
The expenditure on the award
A report by the grant’s dimension value shows what was charged to it in the period.
The salary lines inside it
General ledger detail breaks the expenditure down to payroll and allocation entries.
The employee and period sampled
One person’s allocation entry for one month shows the split that was posted.
The support for the split
That employee’s approved time records for the same month, covering all of her activity, federal and otherwise.
Who approved it
The approval record for each timesheet in the period.
Whether anything changed
The history of each corrected entry, with the original value, the new one and who made the change.
The first three links take minutes, because the ledger was built to answer them. The last three are where an organization either has an answer ready or starts looking for one.
This is also where the two systems have to agree. Suppose payroll posted 60 and 40 in October, and the approved timesheets for October show 70 and 30. The allocation has to be corrected to actual, which is the after-the-fact review (g)(1)(vii) asks for whenever an estimate carried an interim charge.
An organization that runs that comparison every month finds the differences while they are small. One that waits for the auditor finds them all at once, across a year of payroll.
The comparison, as a report
100+ pre-built reports on every plan break approved hours out by project, task, person and period. Setting October’s recorded split beside October’s posted allocation becomes a report you run, not a spreadsheet you build. Custom Fields, on Professional and Enterprise, carry anything else a funder asks to see on the time record.
What does setting up the integration involve?
Mostly decisions about mapping, made once. Every Sage Intacct environment is configured differently, so setting up Sage Intacct nonprofit timesheets starts with how you already manage employees, projects, dimensions and approvals.
| Step | What happens |
|---|---|
| 1 | Connect TimeRewards to your Sage Intacct environment |
| 2 | Review the project, task, item, employee and dimension structure |
| 3 | Decide which of it should synchronize |
| 4 | Map Sage Intacct records to the matching TimeRewards fields |
| 5 | Configure employee assignments and approval workflows |
| 6 | Test synchronization with a limited set of records |
| 7 | Validate the results in Sage Intacct |
| 8 | Train administrators, managers and employees |
| 9 | Expand the integration to the whole organization |
Two of those steps deserve more time than they usually get. The review in step two is where a dimension named Restriction gets renamed before it causes trouble. It is also where each grant’s dimension value is checked against the award it stands for.
The test in step six should include three records on purpose: one split-funded employee, one nonexempt employee, and one timesheet that is rejected, corrected and approved again. Together they exercise every rule in this guide before the whole organization depends on them.
Nothing in that list asks a finance team to change how its books are built. The timesheet takes its shape from the ledger. That is the right way round for an organization whose reports, audits and funders all start from Sage Intacct.
What should you check this month?
Pick one split-funded employee and one recent month.
Pull the salary charged to each award from Sage Intacct, then the approved time records for the same month. Do the percentages agree? If payroll used a budgeted split, was it reviewed and adjusted to the recorded one?
Then check the records themselves. Is every hour against a project and dimension value that exists in Sage Intacct? Did someone other than the employee approve it, and does the history show who changed what?
Last, look at your dimension names and your nonexempt staff. Rename any user-defined dimension containing restriction, event, events or log before the next integration project. Confirm every nonexempt employee has hours recorded for every day worked.
Free · nothing to fill in
Seven checks on one month of salary charges
One employee, one month, about half an hour. Each check matches a rule above.
0 of 7 confirmed
For the arithmetic around a split, the FTE calculator turns hours into full-time equivalents, and the employee cost calculator works out the loaded cost of an hour. The same time record also drives the program, management and fundraising split on the Form 990, which our Form 990 time allocation page covers. Government contractors on the same ledger can read DCAA-compliant timekeeping with Sage Intacct. The award side of grant work is in our guide to nonprofit grant management software.
Questions people actually ask
The Professional and Enterprise plans, from $14.99 per user a month on Professional. Daily timesheets, custom approval workflows, locked timesheets and the complete audit trail come on every plan, including Team at $9.99. Percentage-Based Time Entry and Multi-Level Timesheet Approval Workflow sit on Professional and Enterprise alongside the integration.
Into TimeRewards: customers, projects, tasks, items, employee assignments, department, location, class and the other Sage Intacct dimensions you configure. Back to Sage Intacct: approved time, carrying the accounting references it was recorded against, and expenses recorded in TimeRewards. Sage Intacct remains the financial system of record, and TimeRewards is where time is entered, reviewed and approved.
Yes. Configured Sage Intacct dimensions sync into time entry. An employee’s hours can carry a grant or program classification alongside the project, task, department and location. When the approved time synchronizes, those values travel with it. The hours then report under the same Sage Intacct dimensions as every other cost on the award.
Not on their own. Under 2 CFR 200.430(g)(1)(vii), budget estimates made before the work is performed can carry interim charges. Significant changes have to be recorded promptly, and the charges reviewed after the fact and adjusted to actual. A percentage the employee records as the real share of the period is different: (g)(1)(viii) allows records expressed as a percentage distribution of total activities.
Yes. 2 CFR 200.430(g)(3) requires records of the total hours worked each day for nonexempt employees. That is in addition to the other documentation the standard asks for. It follows the Department of Labor’s recordkeeping rules under the Fair Labor Standards Act. Their daily hours come first, and the salary allocation across awards follows from them.
Under 2 CFR 200.430(g)(8), the federal government may require personnel activity reports, including prescribed certifications, or equivalent documentation. In an audit, salary the records cannot support is at risk of being questioned. Records that meet the standard need no additional support beyond the daily hours for nonexempt staff, under (g)(2).
No. It fits professional services firms, consulting and engineering firms, research organizations and government contractors as well as nonprofits and grant-funded organizations. The setup is the same for all of them, and our nonprofit page covers the rest of what TimeRewards does for grant-funded teams.
Give the ledger a record it can stand on
Daily timesheets against your own Sage Intacct projects and dimensions, approvals before anything posts, and a complete audit trail behind every correction. The Sage Intacct integration comes with the Professional plan from $14.99 per user, with a fourteen-day trial that does not ask for a card.