Indirect Cost Rate: Where Yours Actually Comes From
An indirect cost rate is one number divided by another. The top comes from your accounting system. When the bottom is direct labor, it comes from your timesheets, which is why a coding habit can move a rate you quote on every bid.
Somebody asks what your overhead rate is and you say 42 percent. Then they ask where the number came from.
It is a fraction. A pool of costs on top, an allocation base on the bottom. Change either one and the rate moves.
Most guides explain the top half, because that is accounting and accountants write the guides. The bottom half is often your direct labor, which means it is built out of timesheets, and almost nobody connects those two facts.
The short version
- A rate is a pool divided by a base. Two numbers, and you can get either one wrong.
- A cost is indirect by exclusion. If it cannot be assigned to one final cost objective, it goes in a pool.
- Where the base is direct labor, your timesheets are the denominator. Miscoded hours move the rate directly.
- You cannot fragment an accepted base. Everything properly in it carries a pro rata share.
- Fix the coding, not the spreadsheet. A rate built on a wrong base is wrong however carefully it is calculated.
Before you read the rest
The denominator is the part a timekeeping system decides. Every hour has to land on the right cost objective while the work is happening, because nobody reconstructs a base accurately in month eleven.
TimeRewards gives you Unlimited Projects and Tasks on every plan from $9.99, so your cost objectives can match your real contract structure instead of being squeezed into a short list. Real-time dashboards show you the split as it forms.
What is an indirect cost rate?
A pool divided by a base, expressed as a percentage.
Say your overhead pool for the year is $420,000. Your allocation base, the direct labor those overhead costs support, is $1,000,000. Your overhead rate is 42 percent.
Bill an hour of direct labor and you also bill 42 cents of overhead for every dollar of it. Every pool works the same way.
Most contractors run two or three pools. Fringe, overhead, and general and administrative are the usual set, each with its own base. The arithmetic is the same every time.
What makes a cost indirect?
The FAR defines it by exclusion rather than by naming categories.
The definition, in the clause’s own words
“Indirect costs are those remaining to be allocated to intermediate or two or more final cost objectives.”
Source: FAR 31.203(b)
So the test is not whether a cost feels like overhead. It is whether you can assign it to one final cost objective.
Priya’s hours on the Navy contract go to that contract. Her hours in an all-hands meeting benefit everything, so they land in an indirect cost pool. Same person, same week, two different treatments.
That decision gets made on a timesheet, by the person recording the hour, on the day. It is not made later by an accountant looking at a total.
What is the allocation base, and why is it your timesheets?
The base is what you divide the pool by. The clause requires it to be common to all the cost objectives the pool supports.
How pools and bases have to be formed
“The contractor shall accumulate indirect costs by logical cost groupings with due consideration of the reasons for incurring such costs. The contractor shall determine each grouping so as to permit use of an allocation base that is common to all cost objectives to which the grouping is to be allocated.”
Source: FAR 31.203(c)
The clause does not tell you which base to use. It tells you the base has to be common and has to make sense for the pool.
DCAA’s own guidance for contractors gives direct labor dollars or direct labor hours as its example of an overhead base. Plenty of small contractors use a direct labor base for overhead, because almost everything in that pool exists to support people doing work, and direct labor is measured in exactly one place.
Your timesheets are the denominator. If ten percent of your direct hours were coded to an indirect project code by mistake, your base shrinks by ten percent and your rate rises by more than eleven. Nothing in your accounting system will flag that, because the arithmetic is perfect and the input is wrong.
What keeps the denominator honest
Make the right code the easy one. Unlimited Projects and Tasks on every plan means you never have to bundle three contracts into one code because you ran out of room. Project Teams control who sees which projects, so people are choosing from a short and correct list rather than the whole company’s.
Then see the split before year end. Real-Time Dashboards show billable against non-billable as it forms, and 100+ pre-built exportable reports on every plan give your accountant the direct and indirect totals without anybody rekeying them.
And hand them over cleanly. Export goes to QuickBooks, Sage or SAP. Professional adds One-Button Export To QuickBooks and Advanced Billing Rates and Employee Costs when your rate structure needs more than one bill rate.
Why can you not leave people out of the base?
Because the clause says so, and it is the rule people most often break by accident.
On fragmenting a base
“Once an appropriate base for allocating indirect costs has been accepted, the contractor shall not fragment the base by removing individual elements. All items properly includable in an indirect cost base shall bear a pro rata share of indirect costs irrespective of their acceptance as Government contract costs.”
Source: FAR 31.203(d)
The temptation is understandable. A big commercial job sits in your base, absorbs a large share of overhead, and makes a government bid look expensive. Taking it out would help the bid.
You cannot. If it belongs in the base it carries its share, and a base that quietly loses its inconvenient elements is one of the clearer findings an auditor can write.
What actually goes wrong
Three things, and all three start on a timesheet rather than in a spreadsheet.
Direct work coded as indirect
Somebody books contract work to a general code because it was quicker. The base shrinks, the pool grows, and the rate moves twice in the same direction.
Indirect work coded as direct
Business development hours land on a contract. Now you are billing the government for time spent chasing your next job, which is a much worse conversation than a rate dispute.
The base changes and nobody says so
You move from direct labor dollars to direct labor hours mid-year because it seemed tidier. Consistency between how you estimate and how you report is the thing being tested, so the change needs to be deliberate and documented.
Every one of those is invisible in the rate calculation itself. The arithmetic still works. It is the input that moved.
What should you check this month?
Pull last month’s hours and split them into direct and indirect. It takes an export and about twenty minutes.
Look at what landed in your indirect codes. If a catch-all code is holding a large share of the hours and nobody can say what is in it, that is where your rate is being decided.
Then ask one question of each contract code: could somebody who was not there tell what work it covers? If the answer is no, the base is built on guesses.
Our guides to recording all hours worked and the incurred cost submission both land on the same habit, because the base, the schedules and the rate are all built from the same record.
Free · nothing to fill in
Seven checks on your indirect cost rate
Twenty minutes with last month’s hours, and they are the questions an auditor asks.
0 of 7 confirmed
If the award is recent, what to do after winning a federal contract covers the sequence, and who should approve timesheets covers the process. For the standard itself there is our DCAA compliance overview and the government contractors page. The employee cost calculator shows what a burdened hour costs, the overhead allocation page covers the software side, and any unfamiliar term is in the glossary.
Questions people actually ask
No. FAR 31.203(c) requires you to group indirect costs logically and to choose a grouping that permits an allocation base common to all the cost objectives the grouping is allocated to. It does not name direct labor or anything else. What it asks is that the base makes sense for the pool it serves and that you apply it consistently. Direct labor is common in small contractors because most overhead exists to support people doing work, but that is a practical pattern rather than a rule.
Not once the base has been accepted. FAR 31.203(d) says the contractor shall not fragment the base by removing individual elements, and that all items properly includable in it shall bear a pro rata share of the indirect costs. The temptation is real, because a large job absorbs a lot of overhead and makes a government bid look expensive by comparison. Removing it is one of the more visible findings an auditor can write.
As few as describe your business honestly. Fringe, overhead and general and administrative is a common set for a small contractor and is usually enough. More pools mean more precision and more work, and every extra pool needs its own base and its own explanation. The clause asks for logical groupings with due consideration of why the costs were incurred, which is a test of whether you can explain the structure rather than a target number.
Look at the base before the pool. A rate can rise because overhead grew or because direct labor shrank, and the second is easy to miss. Pull direct hours by month for both years and compare. A drop with no matching drop in revenue usually means hours moved into indirect codes rather than out of the business, and that is a coding change rather than a business change.
The calculation belongs to your accounting system or your accountant, because the pool comes from your general ledger. What a timekeeping system decides is the base, where the base is built on direct labor. In TimeRewards that means unlimited projects and tasks so codes match your real structure, real-time dashboards on the direct and indirect split, and 100+ pre-built exportable reports so the totals reach your accountant without anybody retyping them.
A provisional rate built from your best estimate of the coming year, which you then true up against actuals. Get the estimate wrong and you either bill too little all year or owe money back at the end of it. This is the point where starting with clean coding pays for itself, because the first year of real data becomes the basis of every rate you quote afterwards.
The denominator is decided daily