Grant Time Tracking: What 2 CFR 200.430 Actually Requires

The federal standard for grant time tracking is shorter and less prescriptive than its reputation. There is no required form. There is a list of things your records have to do, and a budget percentage on its own does not do them.

15 min read Updated October 2026 Read from the regulation

2 CFR 200.430 requires that salaries charged to a federal award rest on records of the work actually performed. It names no form and no certification schedule. It lists six things those records must do, and it says a budget estimate alone is not one of them.

This guide to grant time tracking covers what the paragraph says, what a record that meets it looks like, how percentages fit, and the three requirements people miss. It ends with where the 2026 rewrite of the Uniform Guidance stands. Everything here is read from the regulation itself, at 2 CFR 200.430(g).

A program director splits her week between two federal grants and some unrestricted work. At the end of the month, somebody has to say how much of her salary each grant paid for. That number then has to be defensible.

Most organizations answer with a percentage taken from the budget. It is the ordinary way grant-funded payroll gets allocated, and it is done in good faith almost every time. On its own it does not meet the standard.

The short version

  • Charges must rest on records of the work performed. That one sentence is the standard, and six requirements unpack it.
  • There is no required form. Paragraph (g) sets standards a record must meet and leaves the format to you.
  • A budget percentage alone does not support a charge. Interim use is allowed, with conditions and an after-the-fact review.
  • Meet the standard and you owe nobody extra paperwork. Paragraph (g)(2) says exactly that.
  • Fail it and you can be put on personnel activity reports. That is (g)(8), and it is the real consequence.
  • The 2026 rewrite does not touch this paragraph. Congress has also barred the rewrite from being finalized through 11 December 2026.

What does 2 CFR 200.430 require of grant time tracking?

One sentence of principle, then six requirements that unpack it. The paragraph is headed Standards for Documentation of Personnel Expenses, and it opens like this.

The standard, in the regulation’s own words

“Charges to Federal awards for salaries and wages must be based on records that accurately reflect the work performed.”

Source: 2 CFR 200.430(g)(1)

Accurately reflect the work performed. That phrase is the whole test. Everything after it describes what a record has to do before anyone will believe it.

ParagraphWhat the record has to do
(g)(1)(i)Be supported by internal control giving reasonable assurance that charges are accurate, allowable and properly allocated
(g)(1)(ii)Be incorporated into the official records of the organization
(g)(1)(iii)Reasonably reflect the total activity the employee is compensated for, “not exceeding 100 percent of compensated activities”
(g)(1)(iv)Cover federally-assisted and all other activities on an integrated basis, with subsidiary records allowed under written policy
(g)(1)(v)Comply with your own established accounting policies and procedures
(g)(1)(vi)Support how a salary is distributed where somebody works across awards, across federal and non-federal money, or across direct and indirect activity

Read the six together and a shape appears. One integrated record of everything a person did, tied into your books, with controls around it and a written method behind it.

What the shape rules out is a grant-by-grant form filled in from memory at month end, covering only the hours that particular funder pays for. That record fails (iii) and (iv) at the same time, and it is extremely common.

People still call this time and effort reporting, a phrase from the older circulars. The current text talks about documentation of personnel expenses instead. The subject is the same: who worked on what, and what supports the charge.

One record for every funder

TimeRewards gives each grant, program and unrestricted activity its own place for hours to land. Unlimited Projects and Tasks come on every plan, so nothing shares a catch-all code. Automated Email Reminders bring entries in while the week is still fresh, and One-Click DCAA Compliance is on every plan. Plans start from $9.99 per user per month, minimums apply.

Is there a required form for grant time tracking?

No, and there has not been one since the Uniform Guidance replaced the old circulars.

Circulars A-21 and A-87 did require semi-annual certifications and monthly personnel activity reports. Plenty of guidance still online describes that regime as though it were current. It was superseded. What replaced it is a set of standards, which is why two organizations can both be right with completely different paperwork.

There is a paragraph that says so directly, and it is the least-quoted line in the whole section.

What you owe once your records are good

“For records that meet the standards required in paragraph (g)(1) of this section, the recipient or subrecipient is not required to provide additional support or documentation for the work performed other than that referenced in paragraph (g)(3) of this section.”

Source: 2 CFR 200.430(g)(2)

That paragraph is doing real work for you. If your records meet the six requirements, nobody gets to demand a second layer of certification on top of them. The single exception is named inside the clause itself. It is the daily-hours rule for nonexempt staff, covered below.

Flexibility is not the same as freedom, though. Requirement (v) ties your records to your own established accounting procedures, which means you need a written method and you need to follow it. The regulation asks you to have a process. It leaves the choice of process to you.

What does a record that meets the standard look like?

Like a full account of one person’s month, with every hour on a named activity. Take the program director again. Her budget puts her at 40 percent on Grant A, 35 percent on Grant B and 25 percent on unrestricted work.

She records her time as she works it. Over a four-week month of 160 hours, this is what her timesheets add up to, beside what the budget expected.

Sample month for one split-funded employee: 72 hours on Grant A, 48 on Grant B and 40 on unrestricted work, which is 45, 30 and 25 percent against a budget of 40, 35 and 25.
A sample month, week by week. The figures are illustrative; the totals are the ones in the table below.
ActivityBudgetedHours recordedRecorded share
Grant A, federal40% (64 h)7245%
Grant B, federal35% (56 h)4830%
Unrestricted work25% (40 h)4025%
Total100% (160 h)160100%

That table is the record doing all six jobs at once. It covers her whole month, federal and otherwise. It adds up to 100 percent and no more. It shows the distribution across two awards and her unrestricted work, and it came from entries made during the month.

It also shows something the budget could not. Eight hours moved from Grant B to Grant A. If payroll posted the budgeted split, Grant B was charged for five points of salary that her records put on Grant A.

Whether that gap needs correcting is a question for your written policy, which is where the next two sections go. What matters here is that you can only see the gap because the record exists. The employee cost calculator turns those eight hours into dollars if you want to size it.

Is a budget percentage enough to support a salary charge?

Not on its own. This is the failure that turns up most often in grant-funded payroll.

Payroll posts 40, 35 and 25 every month, all year, and the numbers reconcile perfectly. Nobody ever records what the program director actually did. The regulation addresses that arrangement by name.

On budget estimates

“Budget estimates (meaning, estimates determined before the services are performed) alone do not qualify as support for charges to Federal awards, but may be used for interim accounting purposes, provided that:”

Source: 2 CFR 200.430(g)(1)(vii)

Three conditions follow that colon. The estimating system has to produce reasonable approximations of the activity performed. Significant changes in the work have to be identified promptly and entered into the records. And your internal controls have to include periodic after-the-fact reviews, with adjustments so the final amount charged is accurate.

The same section then permits percentages outright. Under (g)(1)(viii), records may reflect categories of activities expressed as a percentage distribution of total activities. So a percentage is a legitimate way to express a record. What it cannot be is a plan you wrote in advance and never revisited.

The difference is whether the number describes what happened or what you intended. The 45 percent in the table above is a record, because it came from recorded hours. The 40 percent in the budget is a forecast, and forecasts do not support charges.

How does the after-the-fact review work?

Someone compares what was charged with what was recorded, on a schedule, and corrects the difference. The regulation sets the outline and leaves the detail to your written policy.

  1. Decide what counts as a significant change

    The regulation leaves “significant” to be defined by your own written policies. A threshold in percentage points is one way to do it. Whatever you choose, write it down, because requirement (v) holds you to it.

  2. Compare on a fixed schedule

    Set the recorded distribution beside the charged one for each split-funded person. The regulation says periodic, so monthly or quarterly both fit, provided you keep to it.

  3. Allow for short swings

    Short-term fluctuations between workload categories, such as one or two months, do not have to be chased, as long as the distribution of salaries is reasonable over the longer term.

  4. Adjust to actual

    Where the difference holds, move the charge. The regulation asks that the final amount charged to the award is accurate, allowable and properly allocated.

  5. Keep the review itself on record

    Who compared, when, and what was adjusted. A review nobody can show happened is hard to tell apart from one that did not.

A percentage posted every month with nobody reviewing it afterward is not an interim estimate at all. It has quietly become the entire system, which is the one thing the paragraph says it cannot be.

A plan, then a record

Percentage-Based Time Entry turns a budgeted split into a confirmed one. An administrator sets a default allocation as guidance. Each week the employee confirms it or adjusts the percentages to how the time was actually spent. It is on the Professional and Enterprise plans, and our guide to auto-filling timesheets by percentage covers the mechanics.

The review then becomes a report. 100+ pre-built reports on every plan show recorded hours by person, by grant and by month, ready to set beside what payroll charged. The FTE calculator helps sanity-check a split against real headcount.

Which requirements do people miss?

Three, and all of them sit outside paragraph (g)(1), which is roughly why they get skipped.

  1. Daily hours for nonexempt staff

    Paragraph (g)(3) brings the Fair Labor Standards Act in on top of everything else. For any employee who is not exempt, you need records showing the total number of hours worked each day. A weekly total will not do it, and a percentage certainly will not. Program assistants, technicians, case workers and coordinators are usually nonexempt, and grant budgets are full of them.

  2. Cost-shared time, documented identically

    Match is the effort you promised a funder that the grant itself does not pay for. Paragraph (g)(4) says those salaries must be supported “in the same manner” as the ones you claim reimbursement for. Organizations often track grant-funded hours meticulously and keep the match on a side spreadsheet, and the side spreadsheet is exactly what an auditor asks to see.

  3. What happens when records fall short

    Paragraph (g)(8) lets the federal government require personnel activity reports, including prescribed certifications, from any organization whose records do not meet the standard. Under the old circulars that meant a signed report for each person, at least monthly. It is the regime the Uniform Guidance was written to move away from. Weak records are how an organization ends up back in it.

Paragraph (g)(8) answers the question people actually have, which is what happens if we get this wrong. The penalty for poor time and effort documentation is rarely dramatic. It is the slow, expensive kind, where a funder stops trusting the numbers and asks for more of them.

Are grant rules the same as contractor rules?

No. Federal grants and federal contracts are different instruments, and they run on different rulebooks.

A contractor lives under the FAR, and under the DFARS for defense work. A grant recipient lives under 2 CFR Part 200, the Uniform Guidance. The audit is different too. A Single Audit under Subpart F is usually performed by your own CPA firm, rather than by a federal agency that turns up on site.

That distinction matters because a lot of what you find searching for grant time tracking was written for contractors. It is stricter than the grant rule in some places and silent in others. An organization following it carefully can end up doing extra work in the wrong direction.

Some organizations hold both. If yours does, run the stricter standard across everything and stop thinking of them as two systems. Two regimes inside one payroll fails at the seams, and the seam is usually a person who charges to both in the same week.

Does the 2026 Uniform Guidance overhaul change this?

Not this part, going by the proposed text, and the rewrite itself is on hold until at least 11 December 2026.

OMB and around forty grantmaking agencies published a proposed rule on 29 May 2026 that would rewrite 2 CFR Part 200. It proposed a final rule effective by 1 October 2026. That date passed without one, because Congress stepped in first.

The Continuing Appropriations Act, 2027, signed in September, says a rule arising out of that proposal, or a substantially similar one, shall not be issued or finalized through 11 December 2026. The current text of Part 200 stays in force in the meantime.

On the substance, the proposal amends section 200.430 in one place. Item 99 of its amendment list revises paragraph (h), on compensation paid to nonprofit trustees and officers. It also revises the opening line of paragraph (i), which covers institutions of higher education. Paragraph (g) is not in the list.

Two cautions belong with that. Plenty else in Part 200 would change under the proposal, so this is no reason to ignore it. And a proposed rule can change before it is final.

What it means for now is narrow and useful. The documentation standard for personnel expenses is not the part being rewritten. If your time and effort reporting satisfies paragraph (g) today, the overhaul is not the reason to change it. Our roundup of 2026 nonprofit compliance changes tracks the pieces that are moving.

Why a standards-based rule favors a configurable system

Because the regulation names no format, the useful question is whether your software can match the way your organization already allocates. TimeRewards is built to be shaped that way round. Rules & Preferences set the approval steps and the timesheet policies. Custom Fields on Professional capture the grant, program or funder codes your reporting uses. Project Teams keep each person choosing from their own short list.

Then the record has to hold up in an audit. Detailed histories of approvals and edits keep the trail, and Multi-Level Approval Workflow on Professional routes a timesheet through program and then finance. Staff enter time through Spreadsheet-Style Entry, Timer Mode or the iPhone and Android apps.

What should you check this month?

Pick one grant-funded employee and follow a single month of their salary from the timesheet through to the general ledger.

Ask three questions on the way. Does the record show what she actually did, or what the budget said she would do? Does it cover all of her time, including the unrestricted work and the match? And if she is nonexempt, does it show hours by day rather than a weekly total?

Where an answer is uncomfortable, fix the record going forward instead of reconstructing the year behind you. A record rebuilt from memory months later is a different thing from one made at the time, and it reads that way to an auditor.

Free · nothing to fill in

Seven checks on your time and effort records

One employee, one month, about half an hour. These are the questions a Single Audit asks of your grant time tracking.

0 of 7 confirmed

For the software side there is our grant compliance time tracking page, and the nonprofits overview covers how grant-funded organizations usually set things up. If your books run on Sage Intacct, our guide to Sage Intacct nonprofit timesheets follows the same record into the ledger, and the award side is in nonprofit grant management software. On process, who should approve timesheets applies to grants as much as to contracts, and any unfamiliar term is defined in the glossary.

Questions people actually ask

Not because of 2 CFR 200.430. Semi-annual certification was a requirement of Circulars A-21 and A-87, which the Uniform Guidance superseded. Paragraph (g)(2) states that records meeting the standard need no additional support, beyond the daily-hours rule for nonexempt staff. Two things can still put you back in the certification business. Your award terms may require it, and a pass-through entity may impose it on subrecipients. Both are contractual rather than regulatory, so read the terms rather than assuming either way.

Personnel activity reports are after-the-fact statements of how an employee’s time was actually distributed. The old circulars required a signed one for each person, at least monthly. Under the current rule they are no longer the default. Paragraph (g)(8) keeps them as something the federal government may require, with prescribed certifications, from an organization whose records do not meet the standard.

Percentages are expressly permitted. Paragraph (g)(1)(viii) says records may reflect categories of activities expressed as a percentage distribution of total activities. The restriction is on where the percentage comes from. A figure derived from recorded activity is a record. The same figure lifted from a grant budget is a forecast. Forecasts may be used for interim accounting on three conditions, the important one being periodic after-the-fact review with adjustment to actuals.

The same way as everyone else, on an integrated basis covering all of her activity. Requirement (iv) asks that records encompass federally-assisted and all other activities together. Requirement (iii) caps the total at 100 percent of compensated activity. General management time has a home: it is indirect activity, which is a cost objective in its own right and belongs in your indirect cost pool. The mistake to avoid is recording only the grant-facing portion of a senior person’s week and leaving the rest undescribed.

Usually yes, because award terms can be stricter than the regulation. 2 CFR 200.430 is a floor rather than a ceiling. A federal agency or a pass-through entity is free to add conditions in the terms of the award. What the regulation prevents is somebody asserting that a template is required by the Uniform Guidance itself, which happens quite often. If a funder asks for a specific format, that is a contractual requirement to meet, and it does not describe what every other funder can expect.

Yes. The current text of paragraph (g) says “recipient or subrecipient” throughout, so a subaward carries the same documentation standard as a direct award. In practice the pass-through entity is responsible for monitoring it, which is why so many subrecipients are handed a certification form. If you are on the receiving end of one of those forms, the standard your records have to meet is still the one in (g)(1). The form sits on top of it.

The record is the thing being judged, so the system that produces it carries most of the load. In TimeRewards that means Unlimited Projects and Tasks on every plan, so each grant, program and match activity becomes a real cost objective. Automated Email Reminders bring entries in while the week is still fresh. Detailed histories of approvals and edits hold the audit trail, and 100+ pre-built exportable reports produce the allocation your auditor asks for. Your written policy and your after-the-fact review stay yours to own, and both get considerably easier once the underlying data is right.

Sources

  1. 2 CFR 200.430, Compensation: personal services, paragraph (g)ecfr.gov, read 26 September 2026, checked again 10 October 2026
  2. Regulation for Federal Financial Assistance, proposed rule, Federal Register document 2026-10817federalregister.gov, read 2 October 2026
  3. H.R. 6500, enrolled: Continuing Appropriations Act, 2027, section 157govinfo.gov, read 2 October 2026

Every hour, on the right grant, the first time

Unlimited projects and tasks, automated reminders and 100+ exportable reports on every plan, with one-click DCAA compliance included. Plans start from $9.99 per user per month, minimums apply, and the fourteen-day trial does not ask for a card.